Electrical Panel Upgrades

Your panel is the heart of the house. If yours is an aging 100 amp service, an obsolete brand, or simply out of room for an EV charger and modern appliances, we upgrade it to a safe, code compliant service with the permit and inspection handled.

Signs Your Panel Is Due

  • Breakers trip when you run the AC, microwave, and dryer at the same time
  • The panel is a Federal Pacific, Zinsco, or other obsolete brand
  • You are adding an EV charger, ADU, heat pump, or electric range and there is no capacity
  • The panel is full, double tapped, or has a history of repairs
  • Your home still has its original service from the 1950s to 1970s

What A Panel Upgrade Includes

A proper upgrade is more than swapping a box. We handle the load calculation, the permit with your city or LADBS, coordination with your utility for the service disconnect and reconnect, new grounding and bonding to current code, and the final inspection. You get a clean, labeled panel with room to grow.

Most homes upgrading today go to a 200 amp service, which comfortably covers an EV charger, modern kitchen appliances, and future electrification. We will size yours based on an actual load calculation, not a guess.

Federal Pacific And Zinsco Panels

Two panel brands common in Los Angeles homes built or updated between the 1950s and 1980s have documented histories of breakers failing to trip. Insurance carriers increasingly flag them during escrow. If your home has one, replacement is the responsible fix, and it is one of the most common jobs we do.

Permits, Utility, And Inspection Handled

Panel work must be permitted and inspected, and the utility has to disconnect and reconnect service. We manage the whole sequence and schedule it to keep your downtime as short as possible. When the inspector signs off, you get the documentation for your records and your insurance.

200 amp electrical panel upgrade with code required service disconnect
200 amp upgrade with code required service disconnect
Good To Know

Frequently Asked Questions

How long does a panel upgrade take?
The physical work is typically completed in a day. The full process, including the permit and utility scheduling, usually spans a few weeks depending on your city and utility queue. We manage the schedule and keep you informed.
Will my power be off during the upgrade?
Yes, for part of the day while the utility disconnects service and we set the new panel. We coordinate the reconnect the same day wherever the utility allows it.
Do I need 200 amps?
Not always. We run a load calculation based on your home and your plans, like an EV charger or an ADU, and recommend the size that actually fits. The answer goes in your written estimate.
Is a permit really required?
Yes. Unpermitted panel work can create problems with insurance and escrow, and it skips the safety inspection. Every panel we install is permitted and inspected.
How much does a panel upgrade cost?
It depends on your service size, the utility, and the condition of the existing equipment, so we quote each job in writing after looking at your setup. The estimate is free and the price is upfront.

Ready To Get Started?

Call or text us for a free written estimate. Upfront pricing, licensed and insured, and work done right the first time.

Request Your Free Estimate
📞 ✉ 💬
Welcome to ElitePhase Electric! If you have any questions, call or text us at (424) 500-3158.